Nur Text Kontakt Impressum Datenschutz
NLWKN

Suche
Start
Erweiterte Suche
English / Nederlands
Portal Niedersachsen
Land Niedersachsen
Weinbergschnecken und Rehe
|
 Aktuelles 
|
 Wasserwirtschaft 
|
 Naturschutz 
|
 Hochwasser-& Küstenschutz 
|
 Andere Themen 
|
 Wir über uns 
|
 Service  | - - - -
Pfad  >  Home  >  Naturschutz  >  Förderprogramme  >  LIFE  >  Westl. Dümmerniederung
- - - -
LIFE
Cuxhavener Küstenheiden
Hohes Moor
Westl. Dümmerniederung
LIFE-Logo
Links to further information about "Dümmer":
LIFE-project Dümmer
General information about the LIFE project
Brief description about Dümmer lowlands
Conservation efforts in the federal country of Lower Saxony
Land purchase
Wetland restoration
Fencing and converting agricultural land to pastures
Special machines
Quiet zone and blocked pathways
Public relation
Breeding and resting birds
Information materials about the LIFE-project
 Please download the flyer or the brochure as pdf-file:
Flyer about the LIFE-projects (size: 850 KB)
Brochure about the LIFE-projects (size: 1,7 MB)
Weiterführende Links zum Thema "Dümmer":
LIFE-Projekt Dümmer
Allgemeine Info zum LIFE-Projekt
Kurzportrait Dümmerniederung
Schutzbestrebungen des Landes Niedersachsen
Flächenankauf
Wiedervernässung
Einzäunungen/Grünlandansaat
Spezialmaschinen
Wegesperrung
Öffentlichkeitsarbeit
Vogelbestände
Informationsmaterialien über die LIFE Projekte
Hier können Sie das Faltblatt und die Broschüre im pdf-Format herunterladen:
Faltblatt über das LIFE-Projekt (Dateigröße: 850 KB)
Broschüre (12-seitig) über die LIFE-Projekte (Dateigröße: 1,4 MB)
Wetland restoration
Adjustable weir in project area.

 

For the successful rewetting of the lowlands it was necessary to build controllable weirs into the drainage ditches and to implement further supporting measures. These measures were realised during a period of several years. 25 adjustable weirs and 12 small dams were built. After the project has been finished, a total area of 1,200 hectares is rewetted now by 43.5 km of dammed ditches.

Though construction of the weirs was not part of the LIFE-project. These measures were financed by the state of Lower Saxony within the project called "Bornbachumleitung”. The LIFE-project financed the construction of supporting dams and the removal of drainages.

These measures aim to develop a large area of wet grassland as a suitable habitat for meadow birds, whilst ensuring a sustainable usage of the grasslands in a way that supports nature conservation., but to reestablish water levels, that were typical for the area before dikes were built on the river Hunte and Lake Dümmer in 1953.

The proposed water levels are shown in the following figure. Flooding in winter and slow step-by-step drainage during early and late spring recreate suitable habitats for numerous species of meadow birds, which were threatened with extinction. At the same time the meadows can be used by the local farmers during the summer and in this way the formerly intensively farmed land can continue to be used for grazing.

 

Waterlevel in time of season

 

During summer season the adjustable weirs are kept open, that the water level sinks about 40 cm below ground. Additional small dams guarantee, that the minimum water level in the sensitive fens doesn’t drop more than 40 cm below ground.

 

Small dam in project area

 

After end of the grazing season around November and beginning of December the adjustable weirs are closed to reach water levels of about 10 cm above ground. Depending on the amount of rain the water level rises in the ditches and the surrounding area gets slightly flooded.

The dimension of flooding can vary in the different polders. In springtime the weirs are opened again step by step to make sure, that the pastures are dry enough in summer for grazing

The date for drawing down the water level is individually regulated on the different polders. On grazing areas for instance water level is drawn down from March at the latest, to make sure, that the cattle doesn’t harm the pasture grounds. In very wet grassland areas, which are preferably cut, drawdown of water level can be delayed until end of  May. Different polders and varying water levels offer a great habitat diversity in the project area.  

After the project has been finished, rewetting of some additional areas will be continued, provided that private land owners do agree in suitable contracts.

 

The rewetted areas, weirs and ditches in the project area
- - - -